GENERAL TERMS AND CONDITIONS

General Terms and Conditions ( PDF )

TENDERING IN PROGRESS

Bilbao: 18 of april 2011

The Sociedad de Hidrocarburos de Euskadi (SHESA) has planned to begin drilling operations of two unconventional gas exploration Wells, ENARA 1 and ENARA 2, to an estimated depth of 5,200 m. For these wells, SHESA wishes to acquire casing and accessories in accordance with the following scope of supply:

Meters Casing Weight Grade Thread Range
1.200 18 5/8” 94.5 # K-55 API - BTC R-III
2.400 13 3/8” 61.0 # K-55 API - BTC R-III
5.500 9 5/8” 54,5 # P-110 Gas Tight (Premium) R-III
4.000 7 5/8” 39.0 # P-110 Gas Tight (Premium) R-III
7..800 5 ½” 23.0 # P-110 Gas Tight (Premium) R-III
2.650 5” 20.3 # P-110 Gas Tight (Premium) R-III
8.000 2 7/8” 10.4 # L-80 Gas Tight (Premium) R-III

All material (tubing and connections) will be manufactured, inspected, protected and marked in accordance with the latest edition of API 5CT (ISO 11960) specifications.
Contracting process: Negotiated with previous announcement of tendering
Companies interested in presenting an offer to supply this material should communicate their interest in writing before 14:00 (Central European Time) on 9 May 2011 to the following address: jvaldes@eve.es.
Upon receiving said communication of interest, all necessary documentation for the preparation and presentation of offers, including General Contracting Conditions and Technical Specifications, will be sent to the interested Company.
This announcement was submitted to the DOUE (Official Journal of the European Union) on 18/04/2011.

 

Bilbao: 18 of april 2011

The Sociedad de Hidrocarburos de Euskadi (SHESA) has planned to begin drilling operations of two unconventional gas exploration Wells, ENARA 1 and ENARA 2, to an estimated depth of 5,200 m. For these wells, SHESA wishes to acquire wellhead material, frac trees, Christmas trees, accessories and installation services in accordance with the following scope of supply.

Description in accordance with API and ISO specifications 6 A and 10423, respectively Amount
Weld-on flange for 21 ¼” diverter for 30” casing 21 ¼ 2M 1
CSG Head assembly Section “A” 13 5/8” 5M complete w/valves & base plate 2
CSG Spool Assy Section “B” 13 5/8” 5M x 11” 10M complete w/valves & accessories 2
Tubing Spool Assy Section “C” 11”10M x 7 1/16” 10M complete w/valves & accessories 2
Frac Tree 7 1/16” x 4 1/16” 10M 1
Gate Valve 7 1/16” 10M Manual Operated 2
Adapter 7 1/16”10M x 2 9/16” 10M (Control line equipped) 2
Christmas Tree 2 9/16” 10M complete w/ two hydraulic actuated valves 2
Casing Hanger 9 5/8” 3
Casing Hanger 5 ½” 3
Tubing Hanger 2 7/8” 2
Accessories Kits: Seals, Glands, Flanges, Gauges. 2


All material will be manufactured, inspected, protected and marked in accordance with the latest edition of API 6A (ISO 10423) specifications.
Contracting process: Negotiated with previous announcement of tendering
Companies interested in presenting an offer to supply this material should communicate their interest in writing before 14:00 (Central European Time) on 9 May 2011 to the following address: jvaldes@eve.es.
Upon receiving said communication of interest, all necessary documentation for the preparation and presentation of offers, including General Contracting Conditions and Technical Specifications, will be sent to the interested Company.
This announcement was submitted to the DOUE (Official Journal of the European Union) on 18/04/2011.

 

Bilbao: 13 of september 2010

The Sociedad de Hidrocarburos de Euskadi S.A. (shesa) wishes to contract the acquisition of 60 km of seismic data (vibroseismic 2D) over an area in the Basque Country (Spain) and the processing of these data through Pre Stack Time Migration (PSTM).

Companies interested in presenting offers for these works/services, will find SHESA’s Contracting General Terms & Conditions in a pdf file on these web site and must communicate their interest to present any offer in writing up to  September 24th, 2010 to the following Email address: jgarcia@eve.es.

Once SHESA has received said notification, the necessary documentation to be able to present the offer will be sent to the Company.